bricks

you have things to do without end, one is stacked upon another,  you work like a bricklayer and as the mortar appears to set, the brick bursts and the same job is back like a bill collector  …  that’s about how i feel right now.   here is the list of these slippery things which will be much shorter than it feels :

revise cca paper,  ASAP

renewal app for LRP — ASAP, Agh!

lead murray’s studies : cca on subtypes + longitudinal studies on whatever we have ,  dec. 1.   ==  currently working on statistical design

finalize oasis study processing — determine parameter effect on power, Working On.

ANTS paper — multivariate analysis results + time parameterized SyN results for labeling, ASAP == need to revise

slides for jim’s trip to beijing, unknown due date.

SPR abstract due the 18th

work on Hoon’s evaluation study

recommendation for pluta — this month

ISMRM abstracts due the 10th == X’d Nov. 10

connectome project writing —  should do today! ==  X’d Nov 9.

draft letter for job requirements : columbia u & upenn & ucla? == X’d Nov. 10

and, finally, fix ANTS to work on gcc4.3 with ubuntu (probably resolved already) ==  X’d Nov 9.

plan lab meeting for Thursday ==  X’d Nov 9.

also, the surf will be potentially great thursday to sunday as it should be in november in new jersey.

Advertisement

About this entry