bricks
you have things to do without end, one is stacked upon another, you work like a bricklayer and as the mortar appears to set, the brick bursts and the same job is back like a bill collector … that’s about how i feel right now. here is the list of these slippery things which will be much shorter than it feels :
revise cca paper, ASAP
renewal app for LRP — ASAP, Agh!
lead murray’s studies : cca on subtypes + longitudinal studies on whatever we have , dec. 1. == currently working on statistical design
finalize oasis study processing — determine parameter effect on power, Working On.
ANTS paper — multivariate analysis results + time parameterized SyN results for labeling, ASAP == need to revise
slides for jim’s trip to beijing, unknown due date.
SPR abstract due the 18th
work on Hoon’s evaluation study
recommendation for pluta — this month
ISMRM abstracts due the 10th == X’d Nov. 10
connectome project writing — should do today! == X’d Nov 9.
draft letter for job requirements : columbia u & upenn & ucla? == X’d Nov. 10
and, finally, fix ANTS to work on gcc4.3 with ubuntu (probably resolved already) == X’d Nov 9.
plan lab meeting for Thursday == X’d Nov 9.
also, the surf will be potentially great thursday to sunday as it should be in november in new jersey.
About this entry
You’re currently reading “bricks,” an entry on emissions from the polluted tube
- Published:
- November 8, 2009 / 1:31 pm
- Category:
- work
- Tags:
No comments yet
Jump to comment form | comment rss [?] | trackback uri [?]